Satellite News

Just another satellite weblog

SBIRS GEO 2 completes Baseline Integrated System Test

Submit on Friday, July 29th, 2011 22:58

The U.S. Air Force’s second Space Based Infrared Systems geosynchronous satellite successfully completed a Baseline Integrated System Test recently at Lockheed Martin Space Systems Company in Sunnyvale, California.
Other Posts:Lunar Eclipses 2001 – 2010Falcon 9/COTS Demo 1 mission successfulETS VIII arrives in geostationary orbitJCSat 13 launch moved forwardRascom-QAF1R and Nilesat 201 pre-launch details‘Your story is rubbish’Sirius 5 to carry EGNOS payloadViaSat receives FAB-T subcontract modification

This entry was posted on Friday, July 29th, 2011 at 10:58 pm and is filed under SATELLITES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

You must be logged in to post a comment.