Satellite News

Just another satellite weblog

MT Aerospace develops upper stage metallic tank of Ariane 5 ME

Submit on Wednesday, June 25th, 2014 22:57

MT Aerospace AG, a subsidiary of OHB AG, received two contracts from Airbus Defence & Space, Prime Contractor of the Ariane 5 ME launcher development programme, and from the European Space Agency ESA with a total value of EUR62.8 million for respectively the development and further qualification of the metallic propellant tank of the new liquid upper stage of the Ariane 5 Mid-life Evolution (A5 ME), and the related production facilities in Augsburg and Bremen.

Related Post:ATK To Develop Composite Technologies For Expendable Launch StructuresATK to develop automated composite technologiesSpace Surveillance System reduces risk of satellite loss by 66%COM DEV International Ltd. results FY 201320th anniversary of GPS Initial Operational CapabilityHarris Receives NPOESS ContractATK to work on multimode propulsionAir Force Orders Fifth Wideband Gapfiller SatelliteZemanta

This entry was posted on Wednesday, June 25th, 2014 at 10:57 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

You must be logged in to post a comment.