December 21st, 2016 by
Rocket: Artiane 5 ECA; Payload: Star One D1, JCSAT-15; Date: 21 December 2016, 2030 UTC; Launch site: Kourou, French Guiana. This was the 11th and final launch of the year for Arianespace, the seventh with Ariane 5 in 2016, as well as the heavy-lift launcher’s 76th consecutive success and its 90th launch overall.
Category: LAUNCHES |
No Comments »
December 20th, 2016 by
Rocket: Epsilon-2; Payload: Exploration of energisation and Radiation in Geospace (ERG) “ARASE”; Date: 20 December 2016, 1100 UTC; Launch site: Uchinoura Space Center, Japan. The launch vehicle flew as planned, and at approximately 13 minutes and 27 seconds after lift-off, the separation of ERG was confirmed.
Category: LAUNCHES |
No Comments »
December 19th, 2016 by
Rocket: Atlas V 431; Payload: EchoStar XIX (aka Jupiter 2); Date: 18 December 2016, 1913 UTC; Launch site: Cape Canaveral Air Force Station, USA. EchoStar XIX deployed its solar arrays on schedule and is successfully performing post-launch manoeuvres according to plan.
Category: LAUNCHES |
No Comments »
December 19th, 2016 by
Millennium Space Systems said it has completed the development of and shipped its first ALTAIR satellite, a pre-production pathfinder spacecraft designed to demonstrate advanced avionics, guidance & control, additive manufacturing, power systems, RF communications and onboard processing technologies.
Category: LAUNCHES |
No Comments »
December 16th, 2016 by
Vector Space Systems, a micro satellite space launch company , announced the successful test of its first stage 5K-lbf [22 kN] engine of the Vector-R launch vehicle.
Category: LAUNCHES |
No Comments »
December 15th, 2016 by
Rocket: Pegasus XL; Payload: eight CYGNSS satellites; Date: 15 December 2016, 1337 UTC; Launch site: Cape Canaveral Air Force Station, USA. For the first phase of the launch, CYGNSS and the Pegasus rocket were carried into the atmosphere beneath Orbital ATK’s “Stargazer” L-1011 carrier aircraft. They were released from the plane at approximately 11.7 km, and then the Pegasus motors ignited, carrying CYGNSS to its intended 35 degree orbit.
Category: LAUNCHES |
No Comments »
December 14th, 2016 by
The CYGNSS launch planned for Wednesday, 14 December was delayed one day due to an issue with flight parameter data used by spacecraft software.
Category: LAUNCHES |
No Comments »
December 14th, 2016 by
Final integration has begun for Arianespace’s year-ending Ariane 5 mission as the Star One D1 and JCSAT-15 satellites are installed on the heavy-lift launcher for lift-off from the Spaceport in French Guiana on 21 December.
Category: LAUNCHES |
No Comments »