Minotaur still grounded because of bad weather
May 9th, 2009 by
Stormy weather has forced NASA to scrub its second scheduled launch TacSat 3 aboard a Minotaur I rocket from NASA’s Wallops Flight Facility.
Category: LAUNCHES | No Comments »
May 9th, 2009 by
Stormy weather has forced NASA to scrub its second scheduled launch TacSat 3 aboard a Minotaur I rocket from NASA’s Wallops Flight Facility.
Category: LAUNCHES | No Comments »
May 7th, 2009 by
The planned launch of TacSat 3 aboard a Minotaur rocket from NASA’s Wallops Flight Facility had to be cancelled because of bad weather.
Other Posts:ProtoStar Opens Singapore Office, Appoints President of ProtoStar AsiaOptus won’t comment on legal action over D1 misconfigurationSES, EchoStar in QuetzSat dealPremiere Hopes To Bounce Back After Revenue FallRadarsat-2 finally ready, but launch delayed againChang’e 1 orbit tweaked; ESA prepares for trackingEDB Fakel Hall thrusters for AerojetThe Boeing Company (Integrated Defense Systems) results Q3 2008
Category: LAUNCHES | No Comments »
May 6th, 2009 by
Rocket: Delta II 7920-10C; Payload: Space Tracking and Surveillance System (STSS) Advanced Technology Risk Reduction (ATRR); Date: 5 May 2009, 2024 UTC; Site: Vandenberg Air Force Base, USA. The military spacecraft was released into its target orbit 58 minutes after lift-off.
Category: LAUNCHES | No Comments »
May 6th, 2009 by
Both spacecraft for the next Ariane 5 launch have been integrated on the launcher, marking a major new step in preparations for Arianespace’s upcoming heavy-lift mission.
Category: LAUNCHES | No Comments »
May 6th, 2009 by
Cold tests were completed last month of the URM-1 (Universal Rocket Module) for the Angara family of launch vehicles at the Russian Integration and Testing Facility of the Rocket and Space Industry Research and Testing Center.
Category: LAUNCHES | No Comments »
May 5th, 2009 by
The dual launch of the space telescopes Herschel and Planck will be the first occasion on which the new horizontal separation system HSS-3 in the Ariane payload fairing will be used.
Category: LAUNCHES | No Comments »
May 5th, 2009 by
Lockheed Martin said a team led by the company is providing support to the NASA Goddard Space Flight Center in the planning, training and implementation of Servicing Mission 4 (SM-4) to the Hubble Space Telescope (HST), scheduled for launch on 11 May.
Category: LAUNCHES | No Comments »
May 5th, 2009 by
Officials from Air Force Space Command’s Space and Missile Systems Center’s Global Positioning Systems Wing announced the release of a request for proposal (RFP) for Phase B of the Next Generation GPS Control Segment (OCX) contracts.
Category: LAUNCHES | No Comments »