Lockheed demos future evolution of GPS III satellite design
Submit on Friday, May 20th, 2016 22:55
In December, the first GPS III satellite completed system-level Thermal Vacuum (TVAC) testing, validating Lockheed Martin’s design and manufacturing processes. Seven more GPS III satellites are following the first one in production flow at Lockheed Martin’s GPS Processing Facility in Denver.
This entry was posted on Friday, May 20th, 2016 at 10:55 pm and is filed under SATELLITES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.