Sky Muster II, GSAT-18 integrated for upcoming Ariane 5 launch
Submit on Wednesday, September 28th, 2016 22:59
The Ariane 5 for Arianespace’s eighth mission of 2016 is now fully assembled following this week’s integration of its two satellite passengers at the Spaceport in French Guiana.
This entry was posted on Wednesday, September 28th, 2016 at 10:59 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.