JWST’s Optical Telescope Element passes CDR
Submit on Thursday, October 29th, 2009 05:58
The telescope element of NASA’s James Webb Space Telescope (JWST), built by Northrop Grumman Corporation, has successfully passed a critical design review verifying it will perform as designed, and now moves forward to final manufacturing steps and integration of all subsystems.
Other Posts:
Next Ariane 5 to be handed over
New GLONASS satellite operational
Pace Releases Latest Results
It’s changing in the big sky
ND SatCom To Introduce New HD Systems
ViaSat Inc. results Q1 FY 2009
ViewAfrica, ViewAsia Networks Select Intelsat for Program Distribution
AMC-21 moved from Zenit 3-SLB to Ariane 5
Other Posts:Last Proton launch on 7 July?Aerojet tests next generation safety capabilityBall Aerospace to build next Landsat cameraLockheed Martin Corporation (Space Systems) results Q2 2006Date set for launch of Russian weather satelliteVEGA awarded ESOC navigation frame contractEchoStar to offer TT&C services for commercial satellitesEMS Satcom equipment to enhance marine surveillance operations
This entry was posted on Thursday, October 29th, 2009 at 5:58 am and is filed under SATELLITES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.