ISRO makes progress in GSLV failure analysis
Submit on Thursday, July 1st, 2010 22:58
ISRO plans to relaunch the Geosynchronous Satellite Launch Vehicle (GSLV) with an indigenous cryogenic engine within twelve months.
Other Posts:Remote Cabin Rentals Bounce Back With Satellite TV For Business5 Very Distinctive Films Now Featured on Satellite TVHamilton Sundstrand power transfer unit enables longer shuttle docking timeNew launch date for China’s first DBS satelliteBall Aerospace Ready To Ship WorldView 1Integral Systems, Inc. preliminary results FY2008Qinetiq Appoints Ex-CIA Director Tenet As Non-Executive DirectorDelay of the day: Ariane 5 ES/ATV
This entry was posted on Thursday, July 1st, 2010 at 10:58 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.