Airbus-built telescope for ESA’s Euclid mission takes shape
Submit on Tuesday, November 19th, 2019 22:57
The Euclid mission is taking shape in Airbus cleanrooms: engineers are now finishing assembly of the telescope, the main instrument of the Payload Module, for which Airbus is responsible within this European Space Agency (ESA) mission led by Thales Alenia Space (TAS) as industrial prime contractor.
This entry was posted on Tuesday, November 19th, 2019 at 10:57 pm and is filed under SATELLITES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.