Delay of the day: GOES-P
Submit on Monday, March 1st, 2010 22:59
Launch of the GOES P weather satellite aboard a Delta IV rocket has been postponed to 4/5 March, in order to replace a component in the fuel-delivery system from the pad to the launcher.
Other Posts:Dnepr crash blamed on poor (Ukrainian) workmanshipAir Force Declares GPS 2R-M Satellite OperationalCommercial Proton launches to resume in NovemberMeridian launch delayed for second timeStumbling stones for Atlantis launch?NASA selects teams for Radiation Belt Storm ProbesBoeing Completes GPS 3 System Design ReviewAustralia’s Optus-D1 Satellite Prepared For Launch
This entry was posted on Monday, March 1st, 2010 at 10:59 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.