EU Commission confirms heavy cost overrun for Galileo
Submit on Tuesday, January 18th, 2011 22:56
The planned European satellite navigation system Galileo needs EUR1.9 billion (US$2.5 billion) on top of the EUR3.4 billion already budgeted for it, the EU commission concluded in a mid-term review of the project.
Other Posts:Satellite Today Blogs From Euroconsult And IBC 2007Alliant Techsystems, Inc. (Space Systems) results FY 2009Chandrayaan-1 spacecraft’s orbit raisedFourth Galileo contract signedShuttle tanking test confirms repair successIntelsat General to provide bandwidth for UAV operations in AfghanistanFalcon 9 on launch pad at Cape CanaveralSo far no more Kepler hiccups
This entry was posted on Tuesday, January 18th, 2011 at 10:56 pm and is filed under BUSINESS. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.


