STS-134: additional testing for faulty power box
Submit on Thursday, May 5th, 2011 22:58
Technicians at the NASA Shuttle Logistic Depot in Cape Canaveral continued additional testing on a faulty power distribution box, called a Load Control Assembly 2 (LCA-2).
Other Posts:ICO files FCC application to extend deadlinesChina to launch Chang’e-2 at the end of 2010SpaceX and Taiwan’s NSPO sign contract to launch Formosat-5JSAT plans to acquire Space CommunicationsAstrium books Falcon 1e launchRussia confirms Kosmos 1818 defragmentationIridium Doubles Customer BaseATK builds support structure for James Webb Space Telescope
This entry was posted on Thursday, May 5th, 2011 at 10:58 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.