Delay of the day: GSLV-D5 launch called-off
Submit on Monday, August 19th, 2013 22:59
The launch of the GSLV-D5 scheduled for 1120 UTC on 19 August 2013 is called off, as a leak is observed in the UH25 fuel system of the liquid second stage during the pre-launch pressurisation phase on the vehicle just two hours before the scheduled lift-off.
This entry was posted on Monday, August 19th, 2013 at 10:59 pm and is filed under LAUNCHES. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.